Welcome to the company ! we have many years of professional experience !
rsdzd@pyzyrsd.com +86 513525609655

illegal sand pumping

Established in 2001, Puyang Zhong Yuan Restar Petroleum Equipment Co.,Ltd, “RSD” for short, is Henan’s high-tech enterprise with intellectual property advantages and independent legal person qualification. With registered capital of RMB 50 million, the Company has two subsidiaries-Henan Restar Separation Equipment Technology Co., Ltd We are mainly specialized in R&D, production and service of various intelligent separation and control systems in oil&gas drilling,engineering environmental protection and mining industries.We always take the lead in Chinese market shares of drilling fluid shale shaker for many years. Our products have been exported more than 20 countries and always extensively praised by customers. We are Class I network supplier of Sinopec,CNPC and CNOOC and registered supplier of ONGC, OIL India,KOC. High quality and international standard products make us gain many Large-scale drilling fluids recycling systems for Saudi Aramco and Gazprom projects.

Certificate of Honor

CONTACT US

Customer satisfaction is our first goal!

Phone

+86 513525609655

E-Mail

rsdzd@pyzyrsd.com

Address

Road West, North Branch, Jingkai Road, Puyang City

illegal sand pumping
Drilling and Production Equipment
Drilling and Production Equipment

F-1600HL drilling ,pump,, developed and manufactured by CNPC Baoji Oilfield Machinery Co., Ltd. (BOMCO), is characterized by large displacement, high pressure and strong reliability. Its power end is almost the same withF-1600 ,pump,, and its hydraulic end adopts an L-shaped structure, with displacement increased by 11.4% andmaximum pressure increased from 35MPa to 52MPa.

INSTALLATION AND OPERATION MANUAL
INSTALLATION AND OPERATION MANUAL

1. Dig the ,hole, for the sewage basin and the sub-base. The ,hole, must be deep enough so that the finished floor is flush with the top of the basin (Figure 1). The sub-base requires 4" ,of sand, or gravel/ crushed rock. Crushed rock pieces should not be larger than 1/2" while the recommended diameter of the pea gravel pieces should not exceed 3/4". 2.

Water and Sanitation: Details and parts list for ...
Water and Sanitation: Details and parts list for ...

After completing the installation, including fixing the ,pump, securely and supporting the suction and delivery hoses, ensure that the suction hose is well submersed in water. Fill the hose with water and prime the ,pump, by filling with water through the priming ,hole, in the ,pump, …

Speci cations Information and Repair Parts Manual 4000 ...
Speci cations Information and Repair Parts Manual 4000 ...

Keep ,pump inlet, clear. Do not install ,pump, directly on clay, earth or ,sand, surfaces. Clean sump pit of small stones, gravel, ,sand,, dirt, silt, etc. which could clog or damage ,pump, or seal and cause ,pump, failure. Keep ,pump inlet, clear. 2. Locate ,pump, in center of pit so that ,pump, housing and any float ,control

Installation Operation Repair and Parts Manual
Installation Operation Repair and Parts Manual

hole, in the ,Pump, Driver Shaft. It is necessary to allow a minimum of 1/8" clearance between the Locking Collar and the ,Pump, Driver Shaft at Set Screw "A" (See Figure 2). 3. Thread the shorter set screw "B" into the other threaded ,hole, in the Locking Collar. 4. Slide ,Pump, Driver Hub over PTO Shaft. Be sure PTO groove is under Set Screw "A ...

Solutions for Oil and Gas Upstream - NETZSCH Bombas
Solutions for Oil and Gas Upstream - NETZSCH Bombas

The primary success of this technology is its ability to convey highly viscous oils at above 50,000 mPas while maintaining stable pressure. What is more, it can do so with almost no pulsation or shear forces. As the body of the progressing cavity ,pump, is comparatively slim, it is perfectly suited to the interior of the bore ,hole,.

NOTICE: VENT HOLE FOR EFFLUENT ... - Zoeller Pump Company
NOTICE: VENT HOLE FOR EFFLUENT ... - Zoeller Pump Company

8. ,Pump, contains ,oil, which becomes pressurized and hot when operating. Allow 2-1/2 hours after disconnecting before attempting service. 9. ,Pump, is not intended for potable water due to possible contamination by ,oil, contained in the ,pump,. 10. Risk of electrical shock. These pumps have not been investigated for use in swimming pools and marine ...

CPP-0 - Cembre
CPP-0 - Cembre

– High pressure valve calibration ,control, (ref. to point 6.4). 6.1) ,Oil, top up – Keep the ,pump, on a fl at surface. – Unscrew the reservoir cap (04) and top up the ,oil,, until the ,hole, is reached. – Tighten the reservoir cap (04). Always use clean recommended ,oil,, see § 1. Do not use old or recycled ,oil,. Do not hydraulic brake fl uid.

How to Maintenance Decanter Centrifuges? - XBSY (WESTPETRO)
How to Maintenance Decanter Centrifuges? - XBSY (WESTPETRO)

Bearing lubrication: Centrifuge a total of four lubrication points, two main bearings and spiral pusher of the two support bearings, with 2 # lithium grease, each operation 100 hours plus an ,oil,, the main bearing refueling, You must open the main bearing below the putter ,oil, bolts, the amount of grease for the grease so far, the screw feeder with a grease gun pressure can be 10 times.

Standard erection manual (pressure parts)
Standard erection manual (pressure parts)

3.3.12 Erect FBHEs coils3.4 All balance pressure ,parts, are erected as parallel activity, comprising of the system from economizer ,inlet, feed line isolation / NRV to main steam line isolation valve at boiler end consisting of all links, drains, vents, expanders, filling line, sampling line, chemical dozing lines, fine fittings etc, with all supports.3.5 Since combustion is pressurized, all attachments panel to panel are to …

Chat Online Inquiry Email

Business cooperation

+86 513525609655

Company address

Road West, North Branch, Jingkai Road, Puyang City